G
Gina82478
Guest
What is the name of your state? New Hampshire
We started having our house built a year ago, and after the builder procrastinating for 10 months it was finally finished enough that we were able to move in 2 months ago. We had a nice shower built in our master bathroom and it was supposed to be tiled, the tile job is falling apart and looks really horrible. We've been trying to get him to come out and fix it for the last 2 months and he finally showed up yesterday, and all he did was tear the tile off the seat and the floor(the whole thing needs redone) and leave. When I asked him about redoing the whole thing he told me that he was only doing what he tore out. Plus he was supposed to show up today and didn't show up or call like we've been dealing with the whole time. Is there anything we can do to get him to come in and finish the rest of the job, or get our money back for it since he was already paid. He also needs to come in and fix walls, and paint and some leaks in the basement.
We started having our house built a year ago, and after the builder procrastinating for 10 months it was finally finished enough that we were able to move in 2 months ago. We had a nice shower built in our master bathroom and it was supposed to be tiled, the tile job is falling apart and looks really horrible. We've been trying to get him to come out and fix it for the last 2 months and he finally showed up yesterday, and all he did was tear the tile off the seat and the floor(the whole thing needs redone) and leave. When I asked him about redoing the whole thing he told me that he was only doing what he tore out. Plus he was supposed to show up today and didn't show up or call like we've been dealing with the whole time. Is there anything we can do to get him to come in and finish the rest of the job, or get our money back for it since he was already paid. He also needs to come in and fix walls, and paint and some leaks in the basement.
Last edited: