A
alindsay
Guest
What is the name of your state? California, Orange County
I requested that my final check be sent down to the reception desk in order for me to pick up on the 10th of this May at 8:00 am. I quit my job on April 30th 2004.
I was told by the controller at the school I worked for that I need to see my supervisor before she , the controller, can release my check to me.
I was told that they can not hold my check, and by CA regs need to give it to me within 3 days after my quit date.
What if I go in Monday, the 10th of May, the day I requested my final check be available to me and they insist that I speak to my supervisor; what can I do at that point?
I'd like to know right away please.
Thank You,
-Ms. Lindsay
I requested that my final check be sent down to the reception desk in order for me to pick up on the 10th of this May at 8:00 am. I quit my job on April 30th 2004.
I was told by the controller at the school I worked for that I need to see my supervisor before she , the controller, can release my check to me.
I was told that they can not hold my check, and by CA regs need to give it to me within 3 days after my quit date.
What if I go in Monday, the 10th of May, the day I requested my final check be available to me and they insist that I speak to my supervisor; what can I do at that point?
I'd like to know right away please.
Thank You,
-Ms. Lindsay