randyg1820
Junior Member
What is the name of your state?Florida
I hired a general contactor to re roof my home. The contact stated the job would be done within 6 weeks. Due to no fault of my own or lack of supplies, the supplies were at my home, after 5 months the roof was only half done and the contractor told me verbally to get someone else to complete the job. Now he wants me to pay him for what he did do and all the materials used. I did give him $1000.00 for materials up front. Do I have to pay him the balance?
I hired a general contactor to re roof my home. The contact stated the job would be done within 6 weeks. Due to no fault of my own or lack of supplies, the supplies were at my home, after 5 months the roof was only half done and the contractor told me verbally to get someone else to complete the job. Now he wants me to pay him for what he did do and all the materials used. I did give him $1000.00 for materials up front. Do I have to pay him the balance?