B
bhahn
Guest
What is the name of your state? Pennsylvania
My husband And I own a general contruction business.
We currently have a job where the homeowner whats her garage turned to a work room with bathroom and/or to be used as a bedroom later on. The homeowner insisted that the work be done by 1/1/04. The homeowner also instructed us that all plumbing issues needed were behind an already existing wall which was later to be determined as false and aquires the work of a lisenced plumber ,a sewage pump and a 3 foot hole. The home owner frequently is demanding changes to the room and then waits a few days and changes it back to original arrangement this has been on going since the contract was made. She is very demanding, and very Rude to say the least. We are still waiting for the plumber,so the bathroom can be completed, This pump,plumber and hole was not included in the cost of this contract. She is as well disputing that. but has agreed to pay for all except plumbers time. She is expecting exact date to when room will be finished however she refuses to speak with the plumber herself to get this date we were given estimated time of completeion and its not satifactory to her. She constantly is calling for changes to be made, dates, etc... what are our chances of terminating this contract with out losing what has already been put into this job as far as meterial,time etc... And to advoid law proceeding from either parties
My husband And I own a general contruction business.
We currently have a job where the homeowner whats her garage turned to a work room with bathroom and/or to be used as a bedroom later on. The homeowner insisted that the work be done by 1/1/04. The homeowner also instructed us that all plumbing issues needed were behind an already existing wall which was later to be determined as false and aquires the work of a lisenced plumber ,a sewage pump and a 3 foot hole. The home owner frequently is demanding changes to the room and then waits a few days and changes it back to original arrangement this has been on going since the contract was made. She is very demanding, and very Rude to say the least. We are still waiting for the plumber,so the bathroom can be completed, This pump,plumber and hole was not included in the cost of this contract. She is as well disputing that. but has agreed to pay for all except plumbers time. She is expecting exact date to when room will be finished however she refuses to speak with the plumber herself to get this date we were given estimated time of completeion and its not satifactory to her. She constantly is calling for changes to be made, dates, etc... what are our chances of terminating this contract with out losing what has already been put into this job as far as meterial,time etc... And to advoid law proceeding from either parties
Last edited: