My wife and I hired a custom cabinet maker to build and install our kitchen and bathroom cabinetry. We signed the drawings on 10-02-2018. The cabinets were supposed to arrive in 8-10 weeks. Install was supposed to take approximately 2 weeks. We signed up for a GreenSky Loan when we signed for the cabinets.
The cabinets finally arrived after approx. 40 weeks. The install was supposed to occur in 1-2 weeks. We are currently living in an apartment with cabinets half installed. All of the cabinets have been installed incorrectly. I don't have a sink, because the incorrectly installed cabinets will not allow me to hook up the new sink or a temporary sink. The salesman and designer came to the house to look at the installation and agreed that the installation is not acceptable. We are in the 4th week now and the install is still incomplete.
I took a look at the Green Sky Loan and found that the cabinet makers incorrectly double charged my wife and I for the cabinets. I have told them they have until the end of the week to come up with an action plan for completing the installation and to correct the charges to my loan.
Is there anything that I should be doing?
The cabinets finally arrived after approx. 40 weeks. The install was supposed to occur in 1-2 weeks. We are currently living in an apartment with cabinets half installed. All of the cabinets have been installed incorrectly. I don't have a sink, because the incorrectly installed cabinets will not allow me to hook up the new sink or a temporary sink. The salesman and designer came to the house to look at the installation and agreed that the installation is not acceptable. We are in the 4th week now and the install is still incomplete.
I took a look at the Green Sky Loan and found that the cabinet makers incorrectly double charged my wife and I for the cabinets. I have told them they have until the end of the week to come up with an action plan for completing the installation and to correct the charges to my loan.
Is there anything that I should be doing?