What is the name of your state?KY
Bought house, room on second floor, already framed, sub floor, insulation, double hung window but was unfinished. Passed inspection.
Owner planned on finishing it. We nailed up sheetrock as it waa cold. We did not get a permit as we did not change anything structural and we did not touch electrical. It has not been taped and ceiling is not up due to the need to install access to the eaves.
Worried I should have had it approved and inspected. Going to have a remo contractor do some work and have them finish the room. If so, I assume they would fix any issues and the fact I did this almost 10 years ago won't matter.
I have read you can get fined for doing work after the fact.
Bought house, room on second floor, already framed, sub floor, insulation, double hung window but was unfinished. Passed inspection.
Owner planned on finishing it. We nailed up sheetrock as it waa cold. We did not get a permit as we did not change anything structural and we did not touch electrical. It has not been taped and ceiling is not up due to the need to install access to the eaves.
Worried I should have had it approved and inspected. Going to have a remo contractor do some work and have them finish the room. If so, I assume they would fix any issues and the fact I did this almost 10 years ago won't matter.
I have read you can get fined for doing work after the fact.