Texas
I am the builder and am currently involved in a cost plus contract. We are building a large home and our AC contractor for the second time didn't follow the exact plans for installing the duct. He did in the bedrooms but he modified the plans in the rest of the house a bit. The home is in the early stage of construction. This contractor has been with us for 8 homes and we never failed an inspection or had any other problems with installations. Two times in a row the contractor is half way done with the duct work and the customer will come out and inspect and say no way. This second time the customer demanded that all the duct be yanked and wanted the contractor replaced with his own. Everything else with the project is going well and I am not in total disagreement that the contractor should of done better but his work would have passed all inspections. My contractor is going to refund what I paid him and move on. My concern is what this customer might have in store for me. Can he terminate the contract and ask for the builder's fee back? Here is just another side story. When the septic system was installed it was done in accordance with the plan. The customer said no way I didn't want it in that location. We had to get several experts tell him it was the only possible location. Finally he calmed down about that.
I am the builder and am currently involved in a cost plus contract. We are building a large home and our AC contractor for the second time didn't follow the exact plans for installing the duct. He did in the bedrooms but he modified the plans in the rest of the house a bit. The home is in the early stage of construction. This contractor has been with us for 8 homes and we never failed an inspection or had any other problems with installations. Two times in a row the contractor is half way done with the duct work and the customer will come out and inspect and say no way. This second time the customer demanded that all the duct be yanked and wanted the contractor replaced with his own. Everything else with the project is going well and I am not in total disagreement that the contractor should of done better but his work would have passed all inspections. My contractor is going to refund what I paid him and move on. My concern is what this customer might have in store for me. Can he terminate the contract and ask for the builder's fee back? Here is just another side story. When the septic system was installed it was done in accordance with the plan. The customer said no way I didn't want it in that location. We had to get several experts tell him it was the only possible location. Finally he calmed down about that.